| Ceiling
Mounted Enclosure
1. Layout and
mark area to be enclosed.
2. Slide roller track (16 RT) through connectors to designated locations.
To make sliding roller track into connectors easier, squeeze ends of roller
track together as you slide into the end of connector. NOTE: using two
pieces of single track held together by a double track connector creates
a double track system.
3. Attach all connectors, such as 16 CC or 16 CAC or 16 CT-3-C, to ceiling.
(Refer to track layout drawing for locations).
4. Line up existing holes or drill holes as necessary in track to accept
set screws that lock into a hole in the track thru the track connector
(use a 3/16 inch hex key).
5. Insert 16 NR 1 1/2" roller hooks provided thru grommets in each
curtain panel. (Note: Due to the thickness of some types of Acoustical
Curtain Panels you may need to pry open roller hooks slightly before installing
thru grommet. Crimp roller hooks tightly to curtain after installing thru
grommet.)
6. Lift curtain panels up to the open end of the track; feed wheels of
roller hooks into track. See drawings for proper panel locations taking
care to note which direction panels face to insure Velcro seals mate properly
to adjacent panels. For double track systems also note on which track
(inside or outside) each panel should be installed.
7. Adjust hardware as necessary to accommodate curtains.
8. Install 16 ES end stops in all open ends of track to prevent rollers
from running out of track.
Floor
& Wall Mounted Enclosure
1. Layout and mark area to be enclosed.
2. Locate all 16 BS (floor base), do not fasten to floor yet.
3. Place all A-256 (columns) onto floor bases.
4. Pre-assemble roller track into track connectors on floor by sliding
roller track (16 RT) through connectors to designated locations. To make
sliding roller track into connectors easier, squeeze ends of roller track
together as you slide into the end of connector. NOTE: See the track orientation
drawing to appropriately locate open ends of track. Also, a double track
system is created by using two pieces of single track held together by
a double track connector.
5. Raise this assembly and slip track connectors on to top of floor columns.
6. Once this is done, measure height to top of connector.
7. Now install 16 EMD or 16 WMD. Attach at the same height taken in step
#6. (Refer to track layout drawing for locations.)
8. Line up existing holes or drill holes as necessary in track to accept
set screws that lock into a hole in the track thru the track connector
(use a 3/16 inch hex key).
9. Insert 16 NR 1 1/2" roller hooks provided thru grommets in each
curtain panel. (Note: Due to the thickness of some types of Acoustical
Curtain Panels you may need to pry open roller hooks slightly before installing
thru grommet. Crimp roller hooks tightly to curtain after installing thru
grommet.)
10. Lift curtain panels up to the open end of the track, feed wheels of
roller hooks into track. See drawings for proper panel locations taking
care to note which direction panels face to insure velcro seals mate properly
to adjacent panels. For double track systems also note on which track
(inside or outside) each panel should be installed.
11. Adjust hardware as necessary to accommodate curtains. Apply and tighten
screws in all connectors.
12. Install 16 ES end stops in all open ends of track to prevent rollers
from running out of track.
13. Anchor base plates to floor.
Floor
Mounted Enclosure
1. Layout and mark area to be enclosed.
2. Locate all 16 B.S. (floor base); do not fasten to floor yet.
3. Place all A-256 (columns) onto floor bases.
4. Pre-assemble roller track into track connectors on floor by sliding
roller track (16 RT) through connectors to designated locations. To make
sliding roller track into connectors easier, squeeze ends of roller track
together as you slide into the end of connector. NOTE: See the track orientation
drawing to appropriately locate open ends of track. Also, using two pieces
of single track held together by a double track connector creates a double
track system.
5. Raise this assembly and slip track connectors on to top of floor columns.
6. Insert 16 NR 1 ½" roller hooks provided thru grommets in
each curtain panel. (Note: Due to the thickness of some types of Acoustical
Curtain Panels you may need to pry open roller hooks slightly before installing
thru grommet. Crimp roller hooks tightly to curtain after installing thru
grommet.)
7. Lift curtain panels up to the open end of the track; feed wheels of
roller hooks into track. See drawings for proper panel locations taking
care to note which direction panels face to insure Velcro seals mate properly
to adjacent panels. For double track systems also note on which track
(inside or outside) each panel should be installed.
8. Adjust hardware as necessary to accommodate curtains. Install self-tapping
screws through top of track connectors into track.
9. Install 16 ES end stops in all open ends of track to prevent rollers
from running out of track.
10. Anchor base plates to floor.
Floor
Mounted Enclosure (panels attach to frame with zip ties)
1. Layout and mark area to be enclosed.
2. Locate all 16 BS (floor base); do not fasten to floor yet.
3. Pre-assemble roller track into track connectors on floor by sliding
roller track (16 RT) through connectors to designated locations. To make
sliding roller track into connectors easier, squeeze ends of roller track
together as you slide into the end of connector. NOTE: See the track orientation
drawing to appropriately locate open ends of track. Also, using two pieces
of single track held together by a double track connector creates a double
track system.
4. Raise this assembly and slip track connectors on to top of floor columns.
5. Line up existing holes or drill holes as necessary in track to accept
set screws that lock into a hole in the track thru the track connector
(use a 3/16 inch hex key).
6. Lift curtain panels up to the track, use plastic ties to attach panels
to track through grommets in each panel. See drawings for proper panel
locations taking care to note which direction panels face to insure Velcro
seals mate properly to adjacent panels
7. Adjust hardware as necessary to accommodate curtains. Apply and tighten
screws in all connectors.
8. Anchor base plates to floor.
Floor
Mounted Enclosure (panels attach directly to frame)
1. Layout and mark area to be
enclosed.
2. Locate all 16 BS (floor base); do not fasten to floor yet.
3. Pre-assemble roller track into track connectors on floor by sliding
roller track (16 RT) through connectors to designated locations. To make
sliding roller track into connectors easier, squeeze ends of roller track
together as you slide into the end of connector. NOTE: See the track orientation
drawing to appropriately locate open ends of track. Also, using two pieces
of single track held together by a double track connector creates a double
track system.
4. Raise this assembly and slip track connectors on to top of floor columns.
5. Line up existing holes or drill holes as necessary in track to accept
set screws that lock into a hole in the track thru the track connector
(use a 3/16 inch hex key).
6. Lift curtain panels up to the track, screw panels to track through
grommets in each panel. See drawings for proper panel locations taking
care to note which direction panels face to insure Velcro seals mate properly
to adjacent panels. For double track systems also note on which track
(inside or outside) each panel should be installed.
7. Adjust hardware as necessary to accommodate curtains. Apply and tighten
screws in all connectors.
8 . Anchor base plates to floor.
Heavy
Duty Floor Mounted
1. Layout and mark area to be enclosed.
2. Locate all floor base columns (do not fasten to floor yet).
3. Lift up and attach cross beams to columns (nuts, bolts, and washers
provided). Spot-weld for extra strength (if necessary).
4. 16 RT track is cut to length and fit thru 16 CC-HD or 16 CC-HD\DBL
track connectors (on ground) before attaching track connectors to cross
beams, (nuts, bolts and washers provided) thru pre-drilled holes in cross
beams. Note: To make sliding roller track into connectors easier, squeeze
ends of roller track together as you slide track into the end of the connector.
5. Line up existing holes or drill holes as necessary in track to accept
set screws
that lock into a hole in the track thru the track connector (use a 3/16
inch hex key).
6. Insert 16 NR 1 1/2" roller hooks provided thru grommets in each
curtain panel. (Note: Due to the thickness of some types of Acoustical
Curtain Panels you may need to pry open roller hooks slightly before installing
thru grommet. Crimp roller hooks tightly to curtain after installing thru
grommet.)
7. Lift curtain panels up to the open end of the track; feed wheels of
roller hooks into track. See drawings for proper panel locations taking
care to note which direction panels face to insure velcro seals mate properly
to adjacent panels. For double track systems also note on which track
(inside or outside) each panel should be installed.
8. Adjust hardware as necessary to accommodate curtains. Apply and tighten
screws in all connectors.
9. Install 16 ES end stops in all open ends of track to prevent rollers
from running out of track.
10. Anchor base plates to floor.
11. Using Tek screws & Fender washers - screw through panel and into
lower crossbeam. (3) Per panel.
Heavy
Duty Floor Mounted (using self tapping screws)
1. Layout and mark area to be
enclosed.
2. Locate all floor base columns; do not fasten to floor yet.
3. Lift up and attach cross beams to columns (nuts, bolts and washers
provided). Spot-weld for extra strength.
4. Attach panels to cross beams, (self-tapping screws & washers provided).
Make sure the panels are facing the proper direction to mate Velcro seals
to
adjacent panels.
5. Anchor bases of columns to floor.
Heavy
Duty Floor Mounted
1. Layout and mark area to be enclosed.
2. Locate all floor base columns (do not fasten to floor yet).
3. Lift up and attach cross beams to columns (nuts, bolts, and washers
provided). Spot-weld for extra strength (if necessary).
4. 16 RT track is cut to length and fit thru 16 CC-HD or 16 CC-HD\DBL
track connectors (on ground) before attaching track connectors to cross
beams, (nuts, bolts and washers provided) thru pre-drilled holes in cross
beams. Note: To make sliding roller track into connectors easier, squeeze
ends of roller track together as you slide track into the end of the connector.
5. Line up existing holes or drill holes as necessary in track to accept
set screws that lock into a hole in the track thru the track connector
(use a 3/16 inch hex key).
6. Insert 16 NR 1 1/2" roller hooks provided thru grommets in each
curtain panel. (Note: Due to the thickness of some types of Acoustical
Curtain Panels you may need to pry open roller hooks slightly before installing
thru grommet. Crimp roller hooks tightly to curtain after installing thru
grommet.)
7. Lift curtain panels up to the open end of the track; feed wheels of
roller hooks into track. See drawings for proper panel locations taking
care to note which direction panels face to insure velcro seals mate properly
to adjacent panels. For double track systems also note on which track
(inside or outside) each panel should be installed.
8. Adjust hardware as necessary to accommodate curtains. Apply and tighten
screws in all connectors.
9. Install 16 ES end stops in all open ends of track to prevent rollers
from running out of track.
10. Anchor base plates to floor.
11. Using Tek screws & Fender washers - screw through panel and into
lower crossbeam. (3) Per panel.
Floor
& Suspended Enclosure
1. Layout and mark area to be enclosed.
2. Locate all 16 BS (floor base), do not fasten to floor yet.
3. Place all A-256 (columns) onto floor bases.
4. Pre-assemble roller track into track connectors on floor by sliding
roller track (16 RT) through connectors to designated locations. To make
sliding roller track into connectors easier, squeeze ends of roller track
together as you slide into the end of connector. NOTE: See the track orientation
drawing to appropriately locate open ends of track. Also, using two pieces
of single track held together by a double track connector creates a double
track system.
5. Raise this assembly and slip track connectors on to top of floor columns.
6. Once this is done, measure height to top of connector.
7. Now suspend all other connectors, such as 16 BC or 16 BAC or 16 CT-3-B,
at the same height taken in step #6. (Refer to track layout drawing for
locations).
8. Line up existing holes or drill holes as necessary in track to accept
set screws that lock into a hole in the track thru the track connector
(use a 3/16 inch hex key).
9. Insert 16 NR 1 1/2" roller hooks provided thru grommets in each
curtain panel. (Note: Due to the thickness of some types of Acoustical
Curtain Panels you may need to pry open roller hooks slightly before installing
thru grommet. Crimp roller hooks tightly to curtain after installing thru
grommet.)
10. Lift curtain panels up to the open end of the track; feed wheels of
roller hooks into track. See drawings for proper panel locations taking
care to note which direction panels face to insure Velcro seals mate properly
to adjacent panels. For double track systems also note on which track
(inside or outside) each panel should be installed.
11. Adjust hardware as necessary to accommodate curtains. Apply and tighten
screws in all connectors.
12. Install 16 ES end stops in all open ends of track to prevent rollers
from running out of track.
13. Anchor base plates to floor.
|