Print | Open Full Page | Save to PDF | Add To Catalog

Green Glue Whisper Clips Installation


Layout Guidelines:

* Clips must be placed at the outermost studs won every piece of the hat channel

 

Whisper Clip Installation

 

Step 1:

Measure for placement of Green Glue Whisper Clips using layout guidelines listed above. Mark locations and install clips using appropriate screws.

Recommended screws by stud type:

  • Wood Use #8 x 2-1/2" coarse thread screws
  • Steel Use #8, 10 or 12 x 1-5/8" T type S self-tapping screws
  • Concrete Use 3/16" dia x 2-1/4" T apron or equal anchor Screw
Outermost clips must be placed at every interval to support the ends of the hat channel
Whisper Clip Installation

Whisper Clip Installation

 

Step 2:

Snap appropriate hat channel into clips.

Recommended hat channel:

  • Walls: 25 gauge hemmed edges
  • Ceilings: 22 gauge
  • Depth: 7/8"
  • Width Top: 1 ¼"
  • Width Bottom: 2 ½"

Most walls will require you to overlap hat channel, instructions for doing so are as follows. Overlap 6 inches of hat channel between two clips. Secure the hat channel with two 7/16" framing screws. 18 gauge tie-wire can also be used.

Whisper Clip Installation
Step 3


Place shims on the floor to allow spacing between the drywall and the flooring. This ensures decoupling from the floor to make it impossible for vibrations to travel from wall to floor and vice-verse.

Screw drywall in place through hat channel. Be sure drywall is fully installed before removing shims from underneath.


Step 4

Be sure to use an acoustical sealant to fill gaps around electrical boxes, windows, doors, and areas below or above sheets of drywall.

Whisper Clip Installation

Print | Open Full Page | Save to PDF | Add To Catalog